By adamg connected Mon, 12/13/2021 - 7:11pm
Rendering by Monte French Design Studio.
A Coolidge Corner developer has projected replacing a three-family location astatine 582 Cambridge St. successful Allston with a $6-million, four-story, 22-unit flat building.
In its filing with the BPDA, Odessit Capital has projected 12 parking spaces and a extortion deck.
Odessit hopes to statesman operation successful the summertime of 2022, with the gathering acceptable for occupancy by fall, 2023.
Ad:
Like the occupation UHub is doing? Consider a contribution. Thanks!