No floating condos for Navy Yard pier

2 years ago 300

By adamg connected Thu, 12/02/2021 - 11:58am

The Charlestown Patriot-Bridge reports the BPDA has dismissed 3 proposals by developers for gathering lodging astatine the Charlestown Navy Yard's rotting Pier 5 - 1 of which called for dealing with rising oversea levels by building the units arsenic floating pods.

The agency, which owns the pier, had solicited proposals for what to bash with it; a residents radical has called for it to beryllium replaced with a park.

Ad:

Like the occupation UHub is doing? Consider a contribution. Thanks!

Read Entire Article