By adamg connected Mon, 09/27/2021 - 9:25am
Rendering by Tim Johnson Architect.
The caller owners of a two-story, three-family location astatine 44 Ellery St. successful South Boston's Andrew Square person filed plans to regenerate it with a six-story,18-unit condo building.
In a filing with the BPDA past week, Malcolm Barber and Niall Dowdall, said the project, a abbreviated locomotion from the Andrew Square T stop, would person six parking spaces.
Three of the condos would beryllium sold arsenic affordable.
They paid $2.6 cardinal for the gathering past period and accidental operation volition outgo $7 million. They anticipation to statesman operation successful mid-2022, with completion scheduled for the extremity of 2023.
Their filing describes the design:
Contextually, the projected six-story gathering takes its plan cues from caller residential and mixed-use projects adjacent the task site, including multi-story multi-family buildings presently nether operation oregon precocious completed oregon approved; to wit: buildings setback from the thoroughfare 10-15 feet, providing accrued nationalist realm area; aggregate units facing the thoroughfare (symbolized by bay windows),and either commercialized abstraction oregon garages astatine the crushed floor. The projected building’s interface with the nationalist realm is celebrated with a landscaped beforehand gait dotted with thoroughfare trees. The backstage realm, quantified by usable unfastened space, consists of dedicated balconies and extortion decks.
Ad:
Like the occupation UHub is doing? Consider a contribution. Thanks!